HomeMy WebLinkAbout2022-06-23 Municipal Planning Commission (Regular) MinutesCOUNTY OF NEWELL
MUNICIPAL PLANNING COMMISSION MEETING
June 23, 2022
The regular Municipal Planning Commission Meeting of the County of Newell was held in the
County Office at Brooks, AB and livestreamed to the public via Lifesize on Thursday, .tune 23,
2022 commencing at 10:00 a.m.
A notice was posted at the front entrance advising the public of the meeting. There were two
members of the public physically in attendance.
MEMBERS PRESENT: A. Doerksen, Reeve
K. Christman, Councillor, M.P.C. Chair
H. Johnson, Councillor, M.P.C. Vice Chair
D. Short, Councillor
A. Skanderup, Councillor
L. Kopp, Councillor
G. Skriver, Councillor
E. Unruh, Councillor
A. Philpott, Councillor
N. Johnson, Councillor
STAFF: M. Fenske, CAO
G. Tiffin, Manager of Planning, Development and Engineering
S. Simpson, Development Clerk
Z. Forest, Municipal Intern, Planning and Development
P. Elliott, Administrative Assistant - Planning
T. Green, Moderator
OTHERS IN D. Rempel, Applicant DP 2022052
ATTENDANCE: A. Ramer, Applicant DP 2022052
1.
2.
3.
P-28122
CALL TO ORDER
The Chairman called the meeting to order at 10:00 a.m.
EXCUSED FROM MEETING
All members were present.
MINUTES
3.1 Minutes - Municipal Planning Commission (June 9, 2022)
MOVED BYCOUNCILLOR DAN SHORT that the minutes of the June 9, 2022 Municipal
Planning Commission meeting be adopted as presented.
MOTION CARRIED
Municipal Planning Commission
June 23, 2022
4. CALL FOR POST AGENDA ITEMS
The Chairman called for post agenda items.
5. ADOPTION OF AGENDA
P-29122 MOVED BY REEVE ARNO DOERKSEN that the agenda be adopted as presented.
MOTION CARRIED
6. DEVELOPMENT PERMITS
6.1 DP 2022052 - Lot 2, Block 1, Plan 0714929, SE 29-20-14-W4, Installation of a
Riding Stable 1 Arena for commercial use
The Development Clerk provided background information on the proposed permit
application.
MPC noted that on the air photo, there was an area showing where horses were
to be boarded and asked if that had changed to the area where horses would be
grazing. The applicant indicated that was correct.
MPC asked if the concerns regarding parking the Village of Duchess had were
resolved. The Development Clerk replied that they had, all parking would remain
on the applicant's parcel.
P-30122 MOVED BY COUNCILLOR NEIL JOHNSON That the Municipal Planning Commission
APPROVE Development Permit 2022052, for the installation of a portable 803 mZ (8640
ftz) riding arena for commercial use on lands legally described as Lot 2, Block 1, Plan
0714929, SE 29-20-14-W4. This development approval is subject to the conditions
outlined below.
LEFT THE MEETING
D. Rempel and A. Ramer left 10:07a.m.
DP 2022052 is Approved for the following reasons:
1. The proposed development complies with the Municipal Development Plan.
2. The Development Authority is satisfied that the proposed development is suitable for
the purpose for which it is intended under the Fringe District, Section 3 General
Regulations and Section 4, Use Standards as specified in the County of Newell Land
Use Bylaw 1892-17.
3. No objections have been received from adjacent landowners or referral agencies
with respect to the proposed development.
Conditions of Development Approval:
a) This approval is effective as of July 13, 2022 (21-day appeal period).
b) The development must be located as shown on the site plan approved with the
application and submitted May 26, 2022. It must be built according to the description
provided with this approval. Any changes shall require the written approval of the
Development Authority.
Page 2 of 5
Municipal Planning Commission
June 23, 2022
c) Any additional development shall require prior approval of a separate permit
application.
d) The developer must start the operation before July 13, 2023 In the event that this
date cannot be met, the developer may be required to apply for a new permit.
e) Should the business cease operation for a period of 12 months or more this
development permit is no longer valid.
f) That the applicant adhere to the County of Newell Animal Control Bylaw 1720-11.
g) That the following setbacks on all sides are maintained for this development:
Side (north): 4 m (14 ft) — variance from 7.6 m (25 ft)
Rear (west): 4 m (14 ft) — variance from 7.6 m (25 ft)
MOTION CARRIED
6.2 DP 2022055 - NW 28-17-12-W4, Operation of an Industrial Heavy Use Business,
specifically a power generation and datacenter operation with ancillary buildings
and structures
The Development Clerk provided background information on the proposed permit
application.
MPC asked if there were any concerns with neighbours. The Development Clerk
replied that all the adjacent landowners had been notified by letter and there
were no responses.
MPC asked if there would be a conflict if the development permit was approved
prior to third reading for the Land Use Amendment review on the Council
agenda. The Development Clerk responded that in the development permit
conditions, construction could not take place until the Land Use Amendment was
approved.
P-31122 MOVED BY COUNCILLOR LYNETTE KOPP That the Municipal Planning Commission
APPROVE Development Permit 2022055 for the operation of an Industrial Heavy Use
Business, specifically a power generation and datacenter operation with ancillary
buildings and structures, on lands legally described as NW 28-17-12-W4. This
development approval is subject to the conditions outlined below.
DP 2022055 is Approved for the following reasons:
1. The proposed development complies with both the Municipal Development Plan and
the Intermunicipal Development Plan.
2. The Development Authority is satisfied that the proposed development is suitable for
the purpose for which it is intended under Section 5, Industrial General District,
Section 3, General Regulations and Section 4, Specific Uses and Activities as
specified in the County of Newell Land Use Bylaw 2016-21.
3. No objections have been received from adjacent landowners or referral agencies
with respect to the proposed development.
Conditions of Development Approval:
a) This approval is effective as of July 13, 2022 (21-day appeal period).
Page 3 of 5 Y--/
Municipal Planning Commission
June 23, 2022
b) The development must be located as shown on the site plan approved with the
application and submitted May 27, 2022. It must be built according to the description
provided with this approval. Any changes shall require the written approval of the
Development Authority.
c) The applicant/owner must obtain all construction permits applicable to development
and is responsible to ensure all permits are closed with work complying to the
building code.
d) That the subject area is rezoned to Industrial General prior to commencing
construction.
e) That the applicant have AUC approval prior to construction, a copy of this submitted
to the County of Newell.
f) That the tower does not exceed 30 metres (98 ft) in height, variance from 20 m (66
ft).
g) Any additional development shall require prior approval of a separate permit
application.
h) That any structure is not located on any right of way or easement on the parcel.
i) That the moved -in building (Trailer) is not used for living purposes.
j) That access can be provided for Emergency Services to all structures.
k) That the following minimum setbacks on all sides are maintained for this
development:
Front (west): as per Alberta Transportation
Side (north and east): 3 m (10 ft)
MOTION CARRIED
6.3 DP 2021109 - Block 1, Plan 8610376, NE 32-22-14-W4, Installation of new
camp sites at existing Emerson Bridge Park
The Development Clerk provided background information on the proposed permit
application.
MPC inquired on the internet improvements that were to take place. The Director
of Agriculture Services indicated that the fibre optics line would be installed from
the cell phone location at the top of the park to three (3) locations at the bottom.
P-32122 MOVED BY COUNCILLOR GREG SKRIVER That the Municipal Planning Commission
APPROVE Development Permit 2021109 for the installation of 12 new full -service
campsites, 3 tent campsites and an existing 42 m2 (456 ftZ) washroom building at the
Emerson Bridge Park, on lands legally described as Block 1, Plan 8610376, NE 32-22-
14-W4. This development approval is subject to the conditions outlined below.
DP 2021109 is Approved for the following reasons:
1. The proposed development complies with the Municipal Development Plan.
2. The Development Authority is satisfied that the proposed development is suitable for
the purpose for which it is intended under the Special, Parks and Public District
(Section 5), as specified in the County of Newell Land Use Bylaw 2016-21.
3. No objections have been received from adjacent landowners or referral agencies
with respect to the proposed development.
Page 4 of 5
Municipal Planning Commission
June 23, 2022
Conditions of Development Approval:
a) This approval is effective as of July 13, 2022 (21-day appeal period).
b) The development must be located as shown on the site plan approved with the
application and submitted January 19, 2022. It must be built according to the
description provided with this approval. Any changes shall require the written
approval of the Development Authority.
c) The applicant/owner must obtain all construction permits applicable to development
and is responsible to ensure all permits are closed with work complying to the
building code.
d) That the campground cannot be used for year-round vehicle storage.
e) That roads shall be surfaced to the satisfaction of the Development Authority and be
a minimum of 4 m (13 ft) width for one way traffic or 6 m (20 ft) in width for two-way
traffic.
f) Any additional development shall require prior approval of a separate permit
application.
g) That the following minimum setbacks on all sides are maintained for this
development:
Front (east): 97 m (318 ft); as per Alberta Transportation
MOTION CARRIED
7. POST AGENDA ITEMS
There were no post agenda items.
8. IN CAMERA
There were no in camera items.
9. QUESTION PERIOD
10. ADJOURN
Being that the agenda matters have been concluded the meeting adjourned at 10:12 a.m.
Signed by the Chairman and Director of Corporate Services this cQt Day of
J L4 L !4
Ch irm
County Administra or