HomeMy WebLinkAbout2011-10-06 Municipal Planning Commission (Regular) Minutes COUNTY OF NEWELL NO. 4
MUNICIPAL PLANNING COMMISSION MEETING
October 6, 2011
Now-
The regular Municipal Planning Commission Meeting of the County of Newell No. 4 was
held in the County Office at Brooks, AB on Thursday, October 6, 2011 commencing at
10:02 a.m.
MEMBERS
PRESENT: M. Douglass, Councillor
C. Amulung, Councillor
M. Nesbitt, Councillor
L. Juss, Councillor
A. Eastman, Councillor
B. de Jong, Councillor
J. Bulger, Councillor
A.M. Philipsen, Councillor & M.P.C. Chair
I. Schroeder, Councillor
R. Andrews, Councillor
STAFF: K. Stephenson, CAO
L. Johnson, Assistant Administrator
D. Horvath, Planner - ORRSC
A. Wickert, Manager of Planning and Development
S. Simpson, Administrative Assistant
vow
OTHERS IN
ATTENDANCE: S. Stanway, Brooks Bulletin
V. Getz, Landowner
J. Getz, Landowner
H. Johnson, Landowner
1. CALL TO ORDER
The Chairman called the meeting to order at 10:02 a.m.
2. EXCUSED FROM MEETING
All members were present.
3. MINUTES
a) September 22, 2011
P-90/11 MOVED BY COUNCILLOR M. NESBITT that the minutes of the September
22, 2011 Municipal Planning Commission meeting be adopted as presented.
MOTION CARRIED
4. CALL FOR POST AGENDA ITEMS
The Chairman called for post agenda items.
5. ADOPTION OF AGENDA
P-91/11 MOVED BY COUNCILLOR A. EASTMAN that the agenda be adopted as
presented.
MOTION CARRIED
6. DEVELOPMENT REPORT
The Manager of Planning and Development provided background on
the Development Report. There was question from M.P.C. regarding
the size of the water tanks, the Manager of Planning and Development
responded that there are 2 tanks holding 500 thousand gallons each.
P-92/11 MOVED BY COUNCILLOR B. DEJONG that the agenda be adopted as
presented.
MOTION CARRIED
7. DEVELOPMENT PERMITS
a) Permit #3550 - NW 30-18-15 W4M, Division 5
Russell and Muriel Leveque / Phil Leveque (Owner) / (Applicant)
Installation of a moved-in building; variance to the front yard setback.
The Manager of Planning and Development provided background
information on the proposed development permit. It was noted that
this application was only brought to M.P.C. because it required a
variance and that the applicant will be improving the appearance of
the building once it is moved on site.
P-93/11 MOVED BY COUNCILLOR M. NESBITT that the Municipal Planning
Commission APPROVE Development Permit #3550 for the installation
of a moved-in building; variance to the front yard setback subject to the
following conditions:
This permit is being granted only for the installation of a 832 ft2 (77.3
m2) moved-in building with a variance to the front yard setback
requirement, on lands legally described as NW 30-18-15 W4M. Any
October 6,2011 Municipal Planning Commission Page 2
J
additional development shall require prior approval of a separate permit
application.
Mr The proposed development complying with:
a) The provisions pertaining to the Agricultural District and all relevant
schedules, as outlined in the County of Newell Land Use Bylaw
#1626-07.
b) All Federal, Provincial and Municipal statutes, regulations, codes and
standards.
c) All Alberta Building Codes and Safety Codes, where applicable.
d) It is responsibility of the developer to obtain all permits from an
accredited inspection agency.
The Municipal Planning Commission has approved DP #3550 for the
following reasons:
1. The proposed development complies with both the Municipal
Development Plan and the Intermunicipal Development Plan.
2. The Development Authority is satisfied that the proposed
development is suitable for the purpose for which it is intended
under the Agricultural District (Schedule 2), Standards of
Development (Schedule 4) and Moved-in Buildings (Schedule 10), as
specified in the County of Newell Land Use Bylaw #1626-07.
3. No objections have been received from adjacent landowners or
referral agencies with respect to the proposed development.
Conditions of Development
a) That this development is located as shown on the site plan approved
in this application and submitted September 12, 2011. Any changes
to that plan shall require the written approval of the Development
Officer.
b) That the following setbacks on all sides are maintained for this
development:
Front (east): 60 ft (18 m) - variance to 100 ft (30 m) setback
requirement
Side and Rear (south and west): 10 ft (3 m)
c) That the property is not used for conducting a business or
commercial operation without first obtaining the required permits.
d) The developer must install the building before October 25, 2012 and
be completed by October 25, 2013. In the event that either of these
dates are not met, the developer may be required to apply for a new
permit.
MOTION CARRIED
b) Permit #3551 - NW 31-18-15 W4M, Division 5
Victor and Karen Getz / Jennifer Getz (Owner) / (Applicant)
Installation of a manufactured dwelling
The Manager of Planning and Development provided background
information on the proposed development permit. It was noted that
there is also a subdivision in process for this landowner that has been
approved. In referrals the Public Works Department has requested an
access agreement which has been provided.
October 6,2011 Municipal Planning Commission Page 3
P-94/11 MOVED BY COUNCILLOR M. NESBITT that the Municipal Planning
Commission APPROVE Development Permit #3551 for the installation of a
manufactured dwelling subject to the following conditions:
This permit is being granted only for the installation of a 1216 ft2 (113
m2) 2011 manufactured dwelling, on lands legally described as NW 31-
18-15 W4M. Any additional development shall require prior approval of a
separate permit application.
The proposed development complying with:
a) The provisions pertaining to the Agricultural District and all relevant
schedules, as outlined in the County of Newell Land Use Bylaw
#1626-07.
b) All Federal, Provincial and Municipal statutes, regulations, codes and
standards.
c) All Alberta Building Codes and Safety Codes, where applicable.
d) It is the responsibility of the developer to obtain all permits from an
accredited inspection agency.
The Municipal Planning Commission has approved DP #3551 for the
following reasons:
1. The proposed development complies with both the Municipal
Development Plan and the Intermunicipal Development Plan.
2. The Development Authority is satisfied that the proposed
development is suitable for the purpose for which it is intended
under the Agricultural District (Schedule 2), Standards of
Development (Schedule 4) and Development Standards for
Manufactured, Mobile, Modular, Ready-to-Move (RTM) Homes
(Schedule 9), as specified in the County of Newell Land Use Bylaw
#1626-07.
3. No objections have been received from adjacent landowners or
referral agencies with respect to the proposed development.
Conditions of Development
a) That this development is located as shown on the site plan approved
in this application and submitted September 12, 2011. Any changes
to that plan shall require the written approval of the Development
Officer.
b) That the following setbacks on all sides are maintained for this
development:
Front (east): 60 ft (18 m) - variance to 100 ft (30 m) setback
requirement
Side and Rear (south and west): 10 ft (3 m)
c) That the property is not used for conducting a business or
commercial operation without first obtaining the required permits.
d) That the developer enter into an access agreement with the adjacent
landowner to the east of the parcel in order to provide access to the
proposed development.
e) The developer must install the building before October 25, 2012 and
be completed by October 25, 2013. In the event that either of these
dates are not met, the developer may be required to apply for a new
permit.
��..� MOTION CARRIED
October 6,2011 Municipal Planning Commission Page 4
c) Permit #3552- NE 19-15-15 W4M, Division 4, Scandia
County of Newell / EID Historical Park (Owner) / (Applicant)
Installation of a moved-in building
The Manager of Planning and Development provided background
information on the proposed development permit. It was noted that
the cost of the renovation and moving the building is being covered by
grants and that the County of Newell has requested a 5 year plan for
the Historical Park. The Manager of Planning and Development read a
letter from the applicant requesting a refund for the application fee
due to the fact that it is a non-profit organization. M.P.C. accepted the
proposal and will refund the application fee.
P-95/11 MOVED BY COUNCILLOR R. ANDREWS that the Municipal Planning
Commission APPROVE Development Permit #3552 for the installation of a
moved-in building subject to the following conditions:
This permit is being granted only for the installation of a 1000 ft2 (92.9
m2) moved-in CPR station building, on lands legally described as NE
19-15-15 W4. Any additional development shall require prior approval
of a separate permit application
The proposed development complying with:
a) The provisions pertaining to the Public Service District and all
relevant schedules, as outlined in the County of Newell Land Use
Bylaw #1626-07.
b) All Federal, Provincial and Municipal statutes, regulations, codes and
standards.
c) All Alberta Building Codes and Safety Codes, where applicable.
d) It is responsibility of the developer to obtain all permits from an
accredited inspection agency.
The Municipal Planning Commission has approved DP #3552 for the
following reasons:
1. The proposed development complies with the Municipal Development
Plan
2. The Development Authority is satisfied that the proposed
development is suitable for the purpose for which it is intended
under the Public Service District (Schedule 2), Standards of
Development (Schedule 4) and Development Standards for Moved-in
Buildings (Schedule 10), as specified in the County of Newell Land
Use Bylaw #1626-07.
3. No objections have been received from adjacent landowners or
referral agencies with respect to the proposed development.
Conditions of Development
a) That this development is located as shown on the site plan approved
in this application and submitted September 14, 2011. Any changes
to that plan shall require the written approval of the Development
Officer.
b) That there is a 2 m (6.6 ft.) separation distance between the new
building and any other buildings or structures on the site.
c) That access can be provided for Emergency Services vehicles to all
sides of the building.
d) That the proposed building is not used for living purposes.
October 6,2011 Municipal Planning Commission Page 5
e) That the following setbacks on all sides are maintained for this
development:
Front and Side: n/a
Vine Rear (Railway Ave): 20 ft (6.1 m)
f) The developer must start installation before October 24, 2012 and
be completed by October 24, 2013. In the event that either of these
dates are not met, the developer may be required to apply for a new
permit.
MOTION CARRIED
8. POST AGENDA
9. IN CAMERA ITEMS
There were no in camera items.
10. QUESTION PERIOD
None
11. ADJOURN
Being that the agenda matters have been concluded the meeting adjourned
at 10:17 a.m.
Signed by the Chairman and Assistant Administrator this Day of , 2011.•
CHAIRMAN!
JFC'
ASST. ADMINIST OR
October 6,2011 Municipal Planning Commission Page 6